- 4
- 4
Oussama Ben-Ammar
8
Documents
Présentation
CURRENT POSITION
================
Associate Professor at the [IMT Mines Alès Engineering School](https://www.imt-mines-ales.fr/)
Member of the [European Centre for Research on Human Movement](https://dhm.euromov.eu/)
Tel: +33 (0)4 34 24 62 80
E-mail: oussama.ben-ammar@mines-ales.fr
SKILLS & INTERESTS
======================
Teaching Skills
---------------
Operations Management, Operations Research, Supply Chain Management, Project Management, Programmaing, Algorithmic and Optimization Probability and Statistics
Research Skills
---------------
Operations Management, Replenishment planning and inventory control, Decision aid under uncertainty, Mathematical and Statistical Modeling, Artificial Intelligence
Languages
---------
Arabic (mother), Maltese (basic), English (fluent), French (fluent)
International Interests
-----------------------
United Kingdom, Germany, USA, Russia, Tunisia
QUALIFICATION
=============
- **2020** Qualifications for the function of associate professor (Sections 26, 27 and 61)
ACADEMIC DEGREES
================
- **2014** Ph.D. in Industrial Engineering, Center of Industrial Engineering and Computer Science, Mines Saint-Etienne, France
- **2010** Master in Computing, Statistics, Applied Mathematics in Production Management, University Toulouse - Jean Jaurès, France
- **2008** License in Applied Mathematics to Social Sciences, University Toulouse - Jean Jaurès, France
WORK EXPERIENCE
===============
- Associate Professor, [IMT Mines Alès](https://www.imt-mines-ales.fr/), [EuroMov DHM](https://www.umontpellier.fr/recherche/unites-de-recherche/euromov-digital-health-in-motion) (**Since September 2021**)
- Assistant Professor, [Mines Saint-Étienne](https://www.mines-stetienne.fr/), [Centre Microélectronique de Provence Georges Charpak](https://www.mines-stetienne.fr/recherche/centres-et-departements/centre-microelectronique-de-provence/), [LIMOS](https://limos.fr/) Gardanne (**2019 - 2021**)
- Temporary Lecturer, [Faculty of Economics and Management](https://feg.univ-amu.fr/en), Aix-en-Provence (**2020-2021**)
- Visiting Professor, [Rennes School of Business](https://www.rennes-sb.fr/), France (**2020**)
- Assistant Professor, [IMT Atlantique](https://www.imt-atlantique.fr/fr), [LS2N](https://www.ls2n.fr/), Nantes (**2016 - 2019**)
- Visiting Professor, [Nottingham University Business School](https://www.nottingham.ac.uk/business/), United Kingdom (**2019**)
- Temporary Lecturer, [Ecole Supérieure du Bois](https://www.esb-campus.fr/), Nantes (**2018 - 2019**)
- Full Temporary Lecturer and Research Assistant (ATER), [University of Toulouse - Jean Jaurès](https://www.univ-tlse2.fr/), [IRIT](https://www.irit.fr/), Toulouse (**2013 - 2015)**
- Teaching Fellow, [Mines de Saint-Etienne](https://www.mines-stetienne.fr/), Saint-Etienne (**2010 - 2013)**
- Master's Training, Laboratory for Analysis and Architecture of Systems, in Modeling ([LAAS - CNRS](https://www.laas.fr/public/)), Toulouse (**2010**)
PUBLICATIONS
============
Publications
- 3
- 2
- 2
- 2
- 2
- 2
- 2
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 8
- 8
- 2
- 2
- 1
- 1
- 1
- 1
- 1
- 3
- 1
- 3
|
A hybrid genetic algorithm for a multilevel assembly replenishment planning problem with stochastic lead timesComputers & Industrial Engineering, 2020, 149, pp.106794. ⟨10.1016/j.cie.2020.106794⟩
Article dans une revue
hal-02935532v2
|
|
Supplier Replacement Model in a One-Level Assembly System under Lead-Time UncertaintyApplied Sciences, 2020, ⟨10.3390/app10103366⟩
Article dans une revue
hal-02572048v1
|
A State of the Art on Supply Planning and Inventory Control under Lead Time UncertaintyStudies in Informatics and Control, 2013, Vol. 22 (No. 3), pp. 255-268. ⟨10.24846/v22i3y201302⟩
Article dans une revue
emse-00877836v1
|
|
Supply planning and inventory control under lead time uncertainty: a literature review and future directionsMIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.10.138⟩
Communication dans un congrès
hal-03709647v1
|
|
Supply Planning and Inventory Control under Lead Time Uncertainty: A Review7th IFAC Conference on Manufacturing Modelling, Management, and Control, 2013, Jun 2013, St Petersburg, Russia. pp. 359-370, ⟨10.3182/20130619-3-RU-3018.00592⟩
Communication dans un congrès
emse-00881549v1
|
|
Planification des réapprovisionnements pour système d'assemblage à deux niveaux quand les délais d'approvisionnement sont aléatoiresQuatorzième congrès annuel de la Société Française de recherche Opérationnelle et d'Aide à la Décision (ROADEF 2013), Feb 2013, Troyes, France. pp.Session 26 : Lot sizing
Communication dans un congrès
emse-00796784v1
|
Optimization Approaches for Multi-level Assembly Systems Under Stochastic Lead TimesEl-Ghazali Talbi, Farouk Yalaoui, Lionel Amodeo. Metaheuristics for Production Systems, 60, Springer International Publishing, pp 93-107, 2015, Operations Research/Computer Science Interfaces Series, 978-3-319-23349-9. ⟨10.1007/978-3-319-23350-5_4⟩
Chapitre d'ouvrage
emse-01250864v1
|
Supplier replacement model in a one-level assembly system under lead-time uncertainty2020
Pré-publication, Document de travail
hal-02523659v1
|