Hanane KRIM
- L'Institut de Recherche Technologique (IRT) de la filière Ferroviaire (IRT Railenium)
- Université Polytechnique Hauts-de-France (UPHF)
- Laboratoire d'Automatique, de Mécanique et d'Informatique industrielles et Humaines - UMR 8201 (LAMIH)
Domaines de recherche
Compétences
Publications
Publications
Governance model for the Innovative Light Train as an area project in a rural area35th International Geographical Congress 2024, Aug 2024, Dublin, Ireland |
|
Parallel machine scheduling with periodic maintenance, job rejection and weighted sum of completion times.ournées de l'optimisation 2019 - WB10 : Operations Research and Computer Science in Transportation, Mobility and Logistics, May 2019, Montréal, Canada |
|
On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance5th International Conference on Control, Decision and Information Technologies (CoDIT'18), Apr 2018, Thessaloniki, Greece. pp.374-378, ⟨10.1109/CoDIT.2018.8394827⟩ |
|
Résumé des travaux de recherche menés dans le cadre d'ELSAT 2020Groupe de travail du projet OLOGMAESTRO (ELSAT/OS2/P2), LGI2A, Oct 2017, Béthune, France |
|
Scheduling with sequence-dependent setup times and periodic maintenance on a single machine to minimize the total weighted completion timeProceedings de la conférence ROADEF 2017, Feb 2017, Metz, France |
|
Minimizing the weighted completion time on a single machine with periodic maintenance.Conférence ROADEF 2016, Feb 2016, Compiègne, France. pp.2 |
|
|
Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion timesJournal of Scheduling, 2021, ⟨10.1007/s10951-021-00711-9⟩ |
Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenanceComputational Optimization and Applications, 2020, 75 (1), pp.291-320. ⟨10.1007/s10589-019-00142-5⟩ |
|
|
|
A variable neighborhood search algorithm for solving the single machine scheduling problem with periodic maintenanceRAIRO - Operations Research, 2019, 53 (1), pp.289-302. ⟨10.1051/ro/2018055⟩ |
Tabu Search for a Parallel-Machine Scheduling Problem with Job Rejection, Inventory Penalties and Periodic Maintenance.[Research Report] CIRRELT; LAMIH, Université Polytechnique des Hauts-de-France. 2020 |
|
Heuristic for single machine scheduling problem with sequence dependent setup-times and periodic maintenance[Research Report] ELSAT-2020-OS2-P2-2020-02-001, LAMIH, Université Polytechnique des Hauts-de-France. 2020 |
|
|
Scheduling under preventive maintenance and sequence-dependent setup-times constraints to minimize job rejection costs or weighted sum of completion timesMultiagent Systems [cs.MA]. Université de Valenciennes et du Hainaut-Cambresis, 2019. English. ⟨NNT : 2019VALE0018⟩ |
Optimisation et simulation pour l’ordonnancement et la maintenance dans un environnement incertain.Poster présenté à la Matinée des Chercheurs 2016 (MDC'16), May 2016, Valenciennes, France |